Road base calculator for North Dakota

Figure compacted-depth tonnage for pads and lanes, where a few inches can add ten tons to an order.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

For a 100-foot lane that is 10 feet wide and 6 inches deep after compaction, plan on about 31 tons of road base. Tonnage builds quickly on lanes, and free delivery is especially useful when 30 tons of hauling can normally rival the stone cost. Road base combines graded crushed stone with fines and weighs about 3,000 lb per cubic yard. It compacts into a firm layer for equipment yards, driveways, and roads. Where specifications permit, use the same calculation for recycled crushed concrete base.

Lane calculations

  1. For a lane, measure its centerline length and calculate from the average width. For pads, multiply the length and width.
  2. For light residential use, allow 4 inches compacted. Use 6 for daily vehicles and delivery trucks, or 8-12 on soft subgrade and under equipment.
  3. For yards, divide cubic feet by 27; for tons, multiply by 1.5; leave +10% for compaction.
Tons = (Length ft × Width ft × Depth in ÷ 12) ÷ 27 × 1.5 × 1.10
Quick figure: one ton ≈ 36 sq ft at 6" compacted

Lane coverage and tonnage

Compacted depth1 ton coversTons per 100 ft of 10-ft lane
4 inches≈ 54 sq ft20.4
6 inches≈ 36 sq ft30.6
8 inches≈ 27 sq ft40.7
12 inches≈ 18 sq ft61.1

Build a lane for the next winter

  • Remove organics before placing base. Topsoil beneath stone will pump mud through it, regardless of how deep the base is.
  • Put woven geotextile over wet or soft subgrade before placing stone. It adds low-cost support beneath a lane.
  • Place material in lifts no deeper than 4 inches, rolling each one before adding the next.
  • Build in a 2-3% crown from the centerline to move rain toward the edges rather than into the base.
  • For a cleaner, lower-dust driving surface, add #57 or driveway gravel on top.
  • Handling 20-plus tons by hand can take a week. A box-blade tractor or skid steer can spread it in an afternoon, so include the machine in the budget.

Example: a 100-foot farm lane

For one hundred by ten feet at 6 inches, the calculation is 1,000 x 0.5 = 500 cubic feet = 18.5 cubic yards, about 28 tons, or 30-31 with the allowance. Plan on two tandem loads and arrange two drop points along the lane instead of one pile at the gate. Separate drops make spreading easier and reduce the need to move stone uphill.

Pads for RVs, containers, and equipment

Apply the lane calculation to pads, but select depth by axle load instead of the calendar. A 12 x 40 RV pad at 6 inches compacted takes about 12 tons. A 20 x 40 equipment yard at 8 inches takes 27. Because shipping containers bear down at four corners, use a full 8 inches plus fabric for container pads even on decent ground, or those corners can settle into the pad by spring.

Recycled concrete road base

Virgin road base and recycled concrete base compact and carry load in much the same way, while recycled material often costs less. Check county requirements first, since some specs call for virgin aggregate. For private pads and lanes, the calculation remains 1.5 tons per yard with the same lifts and crown.

Road base by ton or lane

How do I calculate the road base I need?
Multiply length by width by compacted depth, using feet for each measurement. Divide by 27 to get yards, multiply by 1.5 for tons, and add 10% for compaction. The calculator above includes that allowance.
What does 1 ton of road base cover?
One ton covers about 54 square feet at 4 inches compacted or 36 square feet at 6 inches.
What is the weight of 1 yd of road base?
A loose cubic yard weighs roughly 3,000 lb, or 1.5 tons, then packs tighter after rolling. One tandem truck brings about 10 yards, or 15 tons, per trip.
How deep should road base be for a driveway?
For firm ground with light traffic, use four inches compacted. Use six for everyday vehicles and delivery trucks. Choose eight to twelve on clay, wet ground, or equipment parking areas. Add depth before width because a shallow base fails first.
Road base versus crusher run
They serve similar purposes but finish differently. Road base has a larger top stone for carrying loads; crusher run is finer and grades more smoothly. Choose road base for yards and lanes. Use crusher run for paver bases and close grading. On a regular driveway, let price make the call.
Is fabric needed under road base?
No fabric is needed over firm, well-drained subgrade. For clay, including Red River Valley ground, or places that rut, install woven geotextile between the soil and stone. It keeps the layers separate and can halve the stone needed by a lane over a decade.